Saturday, October 11, 2014

Another Clearing Ride

I rode again in Webster Park to clear some trails of fallen trees. There were two trails I vaguely recalled needing attention so I targeted them and found some work to do.

A few before and after shots:


The second one was big but thankfully only required one cut.  Its diameter was over 12", but the Silky Big Boy 2000 could handle it.  At first it cut fairly quickly but after a few inches it was slow going.  Once it was cut I could see the top few inches looked quite different, so maybe it was rotting or the wood grew differently.


Sunday, October 5, 2014

Trail Clearing Hike

I didn't feel like riding but I still wanted to get out and continue clearing some trails Webster Park. Syd joined me in a hike and we found a few trees to work on.